San Pedro Project, San Pedro, California
An outdated, 2,200-square foot home is being transformed into a spacious, 3,300 square-foot home that promises to set a new standard for eco-friendly construction.
Seacliff Project, San Clemente, California
The homeowners focused on using the only the most efficient and effective green building methods, creating a fully custom home designed to withstand the test of time.
Habitat for Humanity, Los Angeles, California
Fourteen single-family town homes exclusively built for hardworking, deserving families seeking to change their lives.
The O'Brien Residence, Los Altos, California
With two children under the age of three, the O'Brien family was quickly outgrowing their 950-square-foot, two-bedroom home.
The Ketner Residence, Rossmoor, California
With three growing children who were all avid swimmers, the Ketner family was in search of a pool property where they could build their dream home.
The Radnor Renovation, Long Beach, California
A small, 920-square-foot home was beautifully landscaped with a flowing water feature in the expansive backyard.
San Pedro Project, San Pedro, California
An outdated, 2,200-square foot home is being transformed into a spacious, 3,300 square-foot home that promises to set a new standard for eco-friendly construction.
Seacliff Project, San Clemente, California
The homeowners focused on using the only the most efficient and effective green building methods, creating a fully custom home designed to withstand the test of time.
The Kafetzopoulos Residence, San Juan Capistrano, California
This 3,500-square-foot, hacienda-style estate on the hillside of San Juan Capistrano featured a 1,600-sqare-foot, roof-top deck above a 3-car garage.
Laguna Village Fair, Laguna Beach, California
A two-story, outdoor mall with more than 15,000-square-feet of retail space, including 4,500 square feet of common walkway and a subterranean parking garage, had been leaking water for the past 10 years.
Long Beach Terrace, Long Beach, California
To rehab and waterproof 20,000-square-feet of common walkways for 18 buildings that were fully occupied. Project deadline: 18 weeks.


